Formula and meaning
What it means: This is a planning baseline; a competent person may specify a shorter system-specific interval.
Systems with different last-test dates remain separate in the register even when one provider visit is requested.
UK FACILITIES PLANNING TOOL
BUILD YOUR REGISTER
Use one line per comparable system or group. A missing record stays visible as a record gap.
FREE ARTIFACT
| System | Quantity | Next planning date | Record status | Budget band |
|---|---|---|---|---|
| Welding fume extraction | 1 | Find last report | record needed | £200–£389 |
Use it to organise local exhaust ventilation systems before a thorough examination and test (TExT). It applies a 14-month planning window to a recorded test date, but a competent person may advise a shorter interval for a particular system or risk. The budget is a VAT-exclusive planning range, not a national price list.
HSE says employers should arrange a thorough examination and test of LEV at least every 14 months, with more frequent testing where wear can reduce effectiveness. Keep the report, commissioning information and defect actions with the asset record.
Reviewed 12 August 2026. The model excludes repair work, commissioning, exposure monitoring, specialist access, shutdown costs and VAT.
Give them every extraction system, its location, number of hoods or points, last report date and any access restriction. Ask them to identify omissions before visiting.
Separate repairs, recommissioning, replacement filters, duct cleaning, hires and out-of-hours work. A pass/fail label is not a substitute for a clear report and actions.
Tell us what you need. Local provider coverage is still being built, so availability is not guaranteed.
ANSWER & SCOPE
This planner turns a UK local-exhaust-ventilation asset list into a due-date view, grouped-test budgeting allowance, and provider-ready RFQ brief. It treats each system as an asset rather than inventing a single tariff for a whole site.
Use it when a facilities, health-and-safety, or operations lead needs to organise LEV thorough examination and test planning before speaking with competent providers.
HSE says employers should arrange a thorough examination and test of LEV at least every 14 months, while recognising that some systems may need more frequent testing where wear or process conditions can reduce control effectiveness.
HSE — local exhaust ventilation FAQsA useful LEV programme keeps the system list, previous reports, commissioning information, defects and access restrictions together. This tool converts that information into a procurement brief; it does not replace a competent examination.
HSE — commissioning LEV systemsSources reviewed: · WorkResolved methodology · About and corrections