Turn a lifting-equipment list into an interval plan and a cleaner brief for inspection providers.
No email required. A planning tool, not a competent-person examination or legal determination.
PROGRAMME BUILDER
Start with the asset list, not a guessed total.
A written examination scheme can set a different interval. Keep it with the record instead of treating this planner as the scheme.
FREE ARTIFACT
LOLER programme and quote-normalising sheet
Equipment
Basis
Next planning date
Status
Budget band
Unnamed equipment group × 1
12 months
Check scheme / report
record needed
£55–£150
Quote checklist
List every item, accessory and serial/asset reference included.
Separate thorough examination, travel, reporting and any out-of-hours cost.
Ask how defects, unsafe-to-use decisions and report delivery will be handled.
Confirm whether a competent-person written scheme changes the default interval.
How the programme works
Where no competent-person written examination scheme sets another interval, the model uses a 6-month planning interval for equipment lifting people and lifting accessories, and 12 months for other lifting equipment. It never declares an item compliant or safe to use.
Sources and cost limits
HSE describes the default 6- and 12-month thorough-examination intervals, reporting requirements and the possibility of a written examination scheme. Providers commonly quote per item with site mobilisation, reporting and access factors changing the total, so this is an editable grouped-visit range rather than a fixed tariff.
Reviewed 12 August 2026. The model excludes repairs, specialist access, travel exceptions, installation examinations, hire equipment, out-of-hours work and VAT.
Before you accept a quote
Is every item and accessory clearly named?
Ask for asset references or serials, item count, the examination basis and the report deliverable. Do not compare two lump sums with different lists.
What happens if a defect is found?
Confirm the reporting route, any unsafe-to-use process, the availability of remedial work and what is separate from the thorough examination fee.
Need help reviewing the scope?
Tell us what you need. Local provider coverage is still being built, so availability is not guaranteed.
ANSWER & SCOPE
What this tool calculates
This tool converts a UK lifting-equipment list into a planning register with likely examination windows, a grouped-visit budget, and a sheet that makes provider quotes easier to compare item by item.
Use it when an employer, fleet or facilities manager needs a practical starting point for LOLER examination planning without treating the result as a competent-person decision.
Includes
Asset categories and recorded examination dates
Six-month, twelve-month, or written-scheme planning paths
Grouped inspection budget range
Printable quote-normalising checklist
Does not include
A thorough examination or report
Repairs, remedial work, or safe-to-use decisions
Installation examinations and specialist access
A replacement for a competent person or written scheme
Default LOLER intervals vary by lifting-equipment category
HSE describes default thorough-examination intervals of six months for equipment lifting people and lifting accessories, and twelve months for other lifting equipment, unless a competent person has specified a written examination scheme.
The examination report is a core deliverable, not an optional extra
A thorough examination must be performed by a competent person and a written report is required. The planner therefore keeps report scope and asset identification visible when normalising quotes rather than comparing unrelated lump sums.