U.S. FIRE-PROTECTION PROCUREMENT TOOL
Fire pump testing and inspection budget planner
Prepare the test arrangement, evidence and scope that make annual flow-test quotes comparable.
ANNUAL FLOW-TEST BRIEF
Get the test arrangement straight before the contractor arrives.
- Capture rated GPM, PSI, RPM and pump/controller nameplates.
- Confirm the test header, metering loop, discharge path and access.
- Locate acceptance/performance data and prior annual reports.
- Ask how curves, gauges, alarms and deficiencies will be documented.
ANNUAL TESTING ALLOWANCE
$1,575–$2,800Plan for the measured annual test; repairs and impairment work are separate.
- 1 pump assembly in annual-flow-test plan
- Test arrangement unknown — quote after site review
- Electric-drive assumption recorded
- Ask the provider to state how prior performance data will be compared
COMPARABLE RFQ SCOPE
Require these lines in every proposal
- Churn, rated-flow and 150%-flow points (as applicable to the pump and arrangement)
- Calibrated gauges / flow-measurement method and result packet
- Controller, transfer / alarm interfaces and diesel-engine scope explicitly separated
- Deficiencies, repairs, impairment handling and retest work excluded from this budget
Sources and limits
Annual pump flow testing is specialised work. Local code adoption, the actual installation, water supply, manufacturer data, system records and the authority having jurisdiction determine the needed work. This planner is not an inspection, a test procedure or an acceptance decision.