U.S. FACILITIES PLANNING TOOL

Commercial generator maintenance contract planner

Build an annual budget and a provider-ready scope for the standby generators your site actually relies on.
No email required. Planning ranges are not a service contract, life-safety determination or repair diagnosis.

FLEET CONFIGURATOR

Build the contract around your actual standby units.

FREE ARTIFACT

Generator fleet scope sheet

Give providers this inventory

1 comparable 100to500 diesel unit; condition midlife; ATS included; response standard. Ask them to separate routine PM, ATS work, load-bank work, fuel-system work, parts, travel and emergency callouts.

Use a fleet scope, not a one-number quote

Capacity, fuel, age, transfer switching, load-bank work, fuel-system scope and response expectations all change the contract. This tool shows which choices are included and keeps separate work visible.

Sources and limits

PNNL identifies planned O&M and load-bank testing as relevant standby-generator practices. EPA separately regulates certain emergency-generator UST systems. The monetary model uses broad current commercial provider anchors only; it does not decide which standard applies to your facility.

Need help reviewing the scope?

Tell us what you need. Local provider coverage is still being built, so availability is not guaranteed.